Opora Electric Solar · Family owned · A division of Opora Call (916) 249-3013
Call nowGet a quote

Opora / Electric Solar / Services / EV charger installation

Solar, EV and battery

EV charger installation

Level 2 EV chargers for homes, workplaces and fleets, sized to your panel and installed where you park.

What's included

What the job covers.

The exact scope depends on your property. You get it in writing, with the price, before work starts.

  • A panel check and load calculation before anything is installed
  • Hardwired Level 2 chargers or a 240V outlet for a plug-in charger
  • Garage, driveway and carport installs
  • Two-EV homes, including load management when the panel is tight
  • Workplace and fleet charging with several chargers

Safety promise

Safe, to code, and guaranteed.

Electrical work done wrong can start a fire. With 20+ years of experience, we do it right, check it and get it inspected, and we stand behind every job.

Request a quote
  • Permitted and inspectedWe pull the permit whenever the job calls for one, and the work is not finished until it passes city or county inspection.
  • Built to codeEvery circuit is wired to the California Electrical Code: the right breaker, the right wire size and proper grounding.
  • Tested before we leaveWe test every circuit we touch and check connections, breakers and grounding before we call the job done.
  • Hazards pointed outIf we see a fire risk, such as a scorched outlet, an overheating panel or a recalled panel brand, we show you and tell you what it takes to fix it.
  • Done right the first timeWe do the job right the first time. And if anything we installed is ever not right, call us: we come back and fix it at no charge.

When to call

Signs it's time.

  • A new or upcoming EV
  • Level 1 charging from a wall outlet is too slow
  • A second EV in the household
  • Employees or customers asking to charge at work

How it works

From first call to finished job.

  1. Tell us about the job

    Use the quote form or call. Tell us what needs doing and where.

  2. Site visit when needed

    For larger jobs, we look at the panel and the site before quoting.

  3. Written scope and price

    You know what gets done and what it costs before work starts.

  4. The work, then a walk-through

    We finish the job and go over it with you.

Questions

EV charger installation: common questions.

Which charger should I buy?

Most Level 2 chargers work. Tell us the make and model, or ask us to recommend one that fits your panel and the way you drive.

Do I need a panel upgrade for an EV charger?

Not always. We check your panel and your home's load first, then tell you whether the charger fits as is or needs more capacity.

Is the work permitted, inspected and guaranteed?

Yes. We pull the permit whenever the job calls for one, wire to the California Electrical Code, test before we leave, and the work passes city or county inspection. We do it right the first time, and if anything we installed is ever not right, we come back and fix it at no charge.

How is pricing set?

We quote from the details you send, and visit the site first for larger jobs. You get the scope and price in writing before any work starts.

Need ev charger installation?

Send the address and a short description of the job. We will follow up with a written scope and price.

Get a quote

Request a quote.

Four quick steps. We'll follow up with a written scope and price.

(916) 249-3013

What happens next

  1. We review your request

    Usually the same business day.

  2. We reach out

    By phone, text or email, within one business day.

  3. Site visit if needed

    For larger jobs and anything we need to see first.

  4. Written scope and price

    Before any work is scheduled.

  1. Service
  2. Property
  3. Details
  4. Contact
What do you need?
About the property
Where and what
How to reach you

Leave a phone number or an email and we'll get back to you within one business day. For an emergency, call 911.